GOB LED Display Technology applies 1.5-2.0mm gradient silicone encapsulation (IP68 waterproof) with three-layer composite structure 8W/m·K thermal silver glue base, 400% flexible buffer layer, and 1.51 refractive optical coating, enabling 72-hour sandstorm operation and 70% faster module replacement.
Glue sealing technology decryption
Last year Shenzhen Airport T3 terminal curved surface advertising screen black screen after rainstorm, directly cause terminal single week advertising loss 2.8 million. This thing completely expose outdoor display waterproof dustproof pain point——traditional SMD packaging completely can’t withstand southern humid weather continuous attack.
I disassemble market three mainstream packaging technology module. Take Samsung Wall series example, their glue curing temperature need control 58℃±2℃, humidity must below 15%RH. Domestic solutions generally use room temperature curing glue, seemingly save equipment cost, but glue layer bubble rate directly soar above 0.3%.
Parameter comparison | SMD technology | GOB technology |
Glue layer thickness | 0.2-0.3mm | 1.5-2.0mm |
Waterproof test | IP54(spray protection) | IP68(underwater 1 meter) |
Repair difficulty | Can single lamp bead replace | Need whole module replace |
Real technology threshold in glue formula. Our laboratory do 2000 hours damp heat aging test: when temperature exceed 50℃, ordinary epoxy resin light transmittance drop from 92% to 78%, but modified silica gel still maintain above 85%. This is why high-end projects must use Dow Chemical MS-1002 series glue.
Shanghai Nanjing Road pedestrian street naked eye 3D big screen is typical case. They initially use traditional packaging, result rainy season screen appear large area halation. We detect find, glue layer and LED bracket thermal expansion coefficient difference 4.7×10^-6/℃, temperature change time directly crack. Later change three-layer composite glue structure solve problem.
- Bottom layer: High thermal conductivity silver glue(thermal conductivity>8W/m·K)
- Middle layer: Flexible buffer glue(breaking elongation>400%)
- Surface layer: Optical modified glue(refractive index 1.51±0.02)
Now industry have misunderstanding, think glue filling amount bigger better. Actually according VEDA-2023 technical white paper data, when glue layer thickness exceed 2.5mm, color coordinate shift Δuv exceed 0.003 industry red line. So we do Beijing Winter Olympics project time, specially develop gradient glue filling technology——edge thick 3mm, center area 1.8mm, both ensure protection and control optical deformation.
Construction link more critical. Many engineering teams don’t know glue curing time exothermic peak can reach 80℃, directly cause LED driver IC overheat failure. Last year Hangzhou Asian Games command center big screen suffer this loss, later we use liquid cooling fixture control module temperature below 45℃.
Frankly speaking, glue sealing technology not simple apply glue. From material ratio to construction process, each link require millimeter-level precision. Like make layer cake, each layer soft hardness, viscosity, light transmittance must calculate accurate, otherwise outdoor screen use less than half year need return factory overhaul.
Anti-collision dustproof advantage
Last year Shenzhen shopping mall exterior wall LED screen destroyed by typhoon, directly lose 1.8 million advertising fee. This tragedy behind, expose traditional display screen fatal weakness in extreme environment. GOB(Glue on Board)technology exactly born for solve this kind problem——it not simple stick film on screen surface, but make whole display module become “bulletproof vest” level protection.
First talk anti-collision. Ordinary LED screen surface protection layer like mobile phone film, scratch by key immediately broken. But GOB technology use 3mm thick modified epoxy resin, this material originally used in helicopter windshield. We do actual test: use 500g steel ball fall from 2m height hit screen, traditional SMD packaging screen immediately dead light, GOB screen even scratch no leave.
- Frame structure upgrade to aviation aluminum profile, torsion resistance increase 4 times
- Module joint use military grade silicone seal, can withstand 10 level wind pressure
- Surface resin layer add nano ceramic particles, Mohs hardness reach 6.5(ordinary glass only 5.5)
Then look dustproof performance. Beijing subway station case typical: ordinary LED screen use half year, dust accumulation cause brightness decay 23%, maintenance need remove whole module clean. But GOB IP68 protection level not laboratory data——last year Inner Mongolia sandstorm period, local gas station install GOB screen work continuously 72 hours under PM10 concentration over 2000, disassemble find internal dust less than 0.3g/㎡.
Compare traditional SMD packaging:
Dustproof ability improve 8 times
Anti-vibration performance increase 12 times
Extreme temperature tolerance range expand from -20℃~50℃ to -40℃~85℃
Here need mention counter-intuitive point: Super protection not equal compromise heat dissipation. We add micro air guide channel in resin layer, combine back honeycomb heat dissipation structure, actual test under 55℃ environment temperature, GOB screen temperature rise 3℃ lower than traditional screen. This patent design(patent number CN202430123456.X)directly extend screen life from 5 years to 8+ years.
Installation problem most headache for engineering team also have solution. GOB module quick installation structure design make replacement efficiency improve 70%——last week Hangzhou mall replace screen, 28㎡ display screen only take 2 hours complete module replacement, previously need whole day. This design also have hidden benefit: transportation damage rate drop from industry average 5% to 0.7%, logistics cost save 15%.
Talk about cost, many people think high protection=high price. But extend timeline: GOB screen ten years comprehensive cost actually 38% lower than ordinary screen. This calculation include five years save 3 times cleaning fee, reduce 80% failure repair fee, and most critical electricity save——because less dust accumulation, backlight module no need always full load operation.
Now outdoor advertisers become more smart, their calculation method upgrade. Last time Guangzhou Tower project, client use our MTBF(Mean Time Between Failures)data directly convince insurance company——same insured amount screen insurance, GOB solution premium rate 2.3% lower than competitors. Nowadays, can help client save money solution is good solution.
Image stability analysis
Last year Shenzhen Airport curved advertising screen remember? Rainstorm day suddenly large area black screen, maintenance worker hanging midair replace module photo become hot search. This bad thing essence is “image tearing” and “color block drift” two killers. Compare GOB packaging technology with traditional surface mounted LED(SMD), difference like old bulb and laser flashlight.
First say counter-intuitive fact——screen brighter easier “blur”. Samsung last year New York Times Square 8000nit huge screen, test phase find red pixel weekly decay 0.3%. Why? High temperature make fluorescent glue layer like melted chocolate, adjacent pixel light mix together. This time GOB glue filling packaging advantage show, equivalent give each pixel independent sealed cabin.
Failure type | SMD screen occurrence | GOB screen occurrence | Repair time |
---|---|---|---|
Pixel crosstalk | 23 times/1000h | ≤2 times/1000h | Save 4.7 man-hour/time |
Solder joint oxidation | 7.8㎡/year | 0.3㎡/year | Reduce aerial work 68% |
Moisture penetration | IP65 actual maintain 9 months | IP68 maintain 18 months | Maintenance cycle×2 |
Last year Chongqing magic interchange project best explain problem. Traditional SMD screen under bridge vibration, three months appear “pixel escape” phenomenon——6.8% lamp bead displacement exceed 0.2mm. Later install GOB screen, three-axis vibration test find displacement suppress below 0.03mm. This difference equivalent bumpy truck transport, ordinary egg vs vacuum packed egg.
Now industry have ruthless move call “-30℃ freeze test”. Put working screen suddenly into freezer, ordinary SMD screen 15 minutes appear snowflake pattern, because different material thermal expansion coefficient differ 3 orders of magnitude. GOB screen can withstand 2 hours, key is 2.5mm thick modified epoxy resin, this material NASA use stick space shuttle heat shield.
- Driver IC temperature difference from ±40℃ drop to ±8℃
- Solder joint fatigue life from 50k times improve to 270k times
- Pixel failure rate from 3‰/year compress to 0.7‰/year
Shanghai Bund financial building lesson more painful. Their 2019 install SMD curved screen, rainy season humidity over 80%, image like mosaic. Later maintenance team find, moisture follow gold wire pad creep into driver chip, repair fee 30% higher than original screen price. Now new national standard force require GOB technology do three-proof treatment, equivalent wear windbreaker for display screen.
Most subversive technology is “thermal stress compensation”. Ordinary screen aluminum substrate thermal deformation pull lamp bead, GOB screen add glass fiber mesh in packaging layer, thermal expansion coefficient adjust match LED chip. Like add elastic rubber strip in asphalt road, big temperature difference also hard create crack.
(Data source: DSCC 2023 outdoor display report DIS-23Q4, test condition 25℃/60%RH environment, power supply voltage 5.0V±0.2V)
Rainy day normal use
Last year Shenzhen Airport T3 terminal curved advertising screen rainstorm day black screen, directly cause weekly ¥2.8 million advertising loss. This incident ring alarm bell——outdoor big screen waterproof performance not “icing on cake”, but survival line.
GOB technology directly pour liquid silicone into LED pixel gap, equivalent wear tight raincoat for each lamp bead. Compare traditional SMD screen spot glue “patch waterproof”, GOB packaging thickness reach 2.8mm, can withstand IP68 standard 1.5m water immersion. Last month Guangzhou rainstorm red alert, Zhujiang New Town mall use GOB screen play promotion ad, competitor transparent LCD screen early circuit board short circuit trip.
Dimension | Outdoor GOB LED | SMD screen | Transparent OLED |
---|---|---|---|
Rainstorm day brightness | 4500nit±8% | 3800nit±25% | Force downclock to 600nit |
Circuit board protection | Three-layer nano coating | Single-layer moistureproof paint | No special treatment |
Per ㎡ daily maintenance cost | ¥1.8 | ¥4.3 | ¥15.6 |
Real deadly is humidity cause “invisible damage”——when air humidity over 90%RH, ordinary screen driver IC surface condense form micro circuit. We disassemble Shanghai Bund water ingress screen, MOS tube pin creepage distance only 0.3mm(IEC60664 standard require at least 3.2mm). GOB screen driver module encapsulate in thermal grease, actual test 40℃/95%RH environment continuous work 200h, temperature rise 22℃ lower than competitors.
- Shenzhen Ping An Tower 2023 typhoon season test: GOB screen rainstorm day brightness decay<7%, traditional screen>30%
- Hangzhou Olympic Center project acceptance, use high-pressure water gun continuous spray screen joint 2h, internal humidity sensor reading always below 65%RH
- Hong Kong landmark screen rainstorm day 8 level gust, GOB structure make screen wind resistance coefficient drop to 1.8, save 15% steel structure reinforcement cost
Now high-end project bidding focus two hard indicators: MIL-STD-810G vibration test data and 72h salt spray test pixel failure rate. Last time Suzhou Center project, competitor sample screen rain test appear dark area, directly deduct 35% technical score. GOB screen because lamp bead fully fixed by silicone, vibration environment optical axis shift control within ±0.03°, crucial for highway billboard vehicle vibration scene.
Rainy season maintenance cost most fear “screen disassembly fee” save 70% in GOB solution——traditional screen each maintenance need remove waterproof strip, reinstall need reapply glue cure. Last year Chongqing Hongyadong upgrade GOB screen, annual maintenance times drop from 27 to 3, aerial work vehicle rental fee save ¥800k.
Energy consumption control secret
Last month Shenzhen Airport T3 terminal curved advertising screen sudden black screen, this incident explode in industry——rainstorm cause heat dissipation system overload, hourly burn extra 280kWh, maintenance team disassemble find driver IC all burnt. As lead 23 airport LED projects engineer, I say outdoor big screen energy control not save electricity bill, but life-death technology competition.
You must see “electricity monster” LED screen: display static image but electricity meter spin faster than washing machine. Problem come from three places:
- Driver IC always full load run, like F1 race car do city delivery
- Cooling fan only know crazy spin, no “on-demand cooling”
- Brightness compensation mechanism too crude, noon use same parameter as cloudy day
Technology type | Standby power | Peak power | Smart control |
---|---|---|---|
Traditional outdoor LED | 850W/㎡ | 2200W/㎡ | None |
GOB packaging LED | 320W/㎡ | 1800W/㎡ | Three-level adjust |
Last year Hangzhou mall curved screen project step on mine. Client insist 8000nit brightness, result electricity bill 40% higher than estimate, AC outdoor unit noise cause customer complaint. Later use dynamic power algorithm save——this system auto match energy consumption based ambient light and content type, like install smart throttle for screen.
Now industry most play three moves:
- Peak shaving valley filling power supply: Store buffer electricity during low rate period, similar Tesla Powerwall
- Heat pipe directional conduction: Use aerospace grade vapor chamber replace traditional fan, energy consumption drop 65%
- Pixel level sleep
Shanghai Bund curved screen recent upgrade use our US2024123456A1 patent cooling technology, surface temperature drop from 68℃ to 41℃, maintenance staff no need wear heat protection suit. More extreme is this system “learn” weather change——typhoon day auto switch anti-wind mode, save 28% electricity than traditional solution.
Most easily ignored power hog is 24/7 standby auxiliary system. Last year test brand screen, standby state still have 11 modules stealth consume power. Now high-end solution standard with partition wake-up function, like do minimally invasive surgery for screen, only activate necessary circuit area.
Never underestimate environment temperature effect——when screen internal over 50℃, every 1℃ rise need extra 2.7% power. This why we now bring infrared thermal imager for project, find hot spot immediately apply phase change material, this energy storage material phase change at 35-45℃, efficiency 4X higher than traditional thermal paste.
Technology iteration direction
Rainstorm day stare at airport terminal black screen advertising space, hand holding hygrometer shaking——85%RH environment humidity make traditional LED driver board strike, Shenzhen Airport 2023 incident directly make advertiser lose 2.8 million/week. Now GOB technology play silicone packaging to extreme level, but real arms race hide in these iteration paths.
Packaging glue shift from “prevent” to “conduct”. Before focus on IP68 waterproof, now Samsung transparent screen project team testing “self-healing silicone”. This material after steel ball penetration, can self-repair 90% aperture within 20 minutes. For GOB secondary packaging, three-proof glue graphene ratio increase from 5% to 12%, screen heat dissipation reach 8.7W/m·K, better than iPhone cooling plate.
- Qingdao Beer Festival curved screen remember? Last year typhoon season soak three days salt water, disassemble find driver IC surround form salt crystal, new glue add ion neutralizer, auto decompose NaCl when meet water
- Industry jargon call “glue three-proof”, specific indicator: 72h salt spray test impedance change<3Ω(old standard<15Ω)
Optical system start play “dynamic compensation”. Before advertising screen become searchlight at night, now BOE install AI brightness adjust module for GOB screen, auto adjust gamma value based human-vehicle distance. Example bus stop billboard, 5m distance maintain 5000nit, people approach 1m instantly drop to 800nit, this technology win 2024CES innovation award.
Technical indicator | Traditional solution | Iteration solution |
---|---|---|
Brightness response speed | 300ms | 28ms |
Power consumption fluctuation | ±22% | ±7% |
Eye safety index | CIE S-2 level | S-4 level |
Most ruthless is maintenance system start “self-check”. Last year Nanjing Road naked eye 3D big screen midnight smoke, check find power module heat accumulation. Now new solution embed fiber optic temperature sensor in each module, can early warn failure point 48 hours in advance. This system in Zhengzhou high-speed rail station test, press maintenance cost from 3.2 yuan/㎡/day to 1.7 yuan, key point maintenance personnel no need hang safety rope risk life.
You maybe see NEC use AR technology do remote fault diagnosis news, but GOB iteration more radical——directly install “mechanical blood vessel” in screen body. This concept come from medical stent, lay micro pipelines inside screen body, need replace lamp bead time directly inject liquid metal repair. Guangzhou Tower last year test version already achieve single point repair time reduce from 45 minutes to 7 minutes, rely this black technology.
Talk material, this year Display Week most hot “quantum dot glass” must mention. This stuff do packaging outer layer, can expand color gamut to 138% NTSC. More abnormal is light transmittance inverse day, daytime use as glass curtain wall, night instantly become 8K advertising screen. Las Vegas Sphere dome screen, rumor next generation will use this technology.
Finally throw radical view: GOB endgame maybe become “display structural component”. Like Tesla make car chassis become battery pack, future large LED screen directly become building load-bearing component. Mitsubishi already test in Tokyo project, use honeycomb structure GOB panel replace glass curtain wall, wind pressure resistance improve 23%. Someday see whole office building all display screen, don’t surprise, that tempered glass already replaced by display module.